top of page

BRISBANE + GOLD COAST

Built Right.
First Time.
Stays Dry.

Premium Waterproofing + Construction SOLUTIONS 

WHO WE ARE

Expert solutions.

Decades of experience.

Built on quality.

We bring proven qualifications, experience, and technical expertise to every project.

​

We understand the full build ecosystem — including site conditions,  planning, trade sequencing, compliance, quality assurance, testing and certification.

​

The result is work delivered correctly, on time, and fully documented.

Premium Waterproofing + Construction Solutions

WATERPROOFING + CONSTRUCTION SOLUTIONS     ||    WATERPROOFING + CONSTRUCTION SOLUTIONS     ||     WATERPROOFING + CONSTRUCTION SOLUTIONS

$10m+

Completed Projects

25+

Years' Experience

#1

Multi Award-Winning

||     WATERPROOFING + CONSTRUCTION SOLUTIONS    ||

#1

Multi Award-Winning

25+

Years' Experience

Expert solutions.

Decades of experience.

Built on quality.

We bring proven qualifications, experience, and technical expertise to every project.

​

We understand the full build ecosystem — including site conditions,  planning, trade sequencing, compliance, quality assurance, testing and certification.

​

The result is work delivered correctly, on time, and fully documented.

Premium Waterproofing + Construction Solutions

$10m+

Completed Projects

25+

Years' Experience

#1

Multi Award-Winning

WATERPROOFING + CONSTRUCTION SOLUTIONS   ||   WATERPROOFING + CONSTRUCTION SOLUTIONS

25+

Years' Experience

#1

Multi

Award-Winning

$10m+

Completed Projects

#1

Multi Award-Winning

25+

Years' Experience

Expert solutions.

Decades of experience.

Built on quality.

We bring proven qualifications, experience, and technical expertise to every project.

​

We understand the full build ecosystem — including site conditions,  planning, trade sequencing, compliance, quality assurance, testing and certification.

​

The result is work delivered correctly, on time, and fully documented.

Premium Waterproofing + Construction Solutions

$10m+

Completed Projects

25+

Years' Experience

#1

Multi Award-Winning

Services

Screenshot 2026-06-11 094727.png
mapei-logo.png
ardex-logo-black.png
soprema-building-for-life-web-rgb-adapted-version-1_fbadfd639a91d7498b02c75cf7a0bf70.png
Screenshot 2026-06-11 094310.png
Screenshot 2026-06-11 094359.png
official-member1.jpg
Screenshot 2026-06-11 094640.png

INDUSTRY ALIGNED +

TRAINED.

We comply with/are trained and certified by the suppliers, manufacturers, industry bodies, and regulators that define the, licenses, requirements and standards.

  • Transparent quotes with no hidden fees

  • Qualified builders, waterproofers, carpenters, and construction managers

  • Delivered on time, on budget, and aligned with critical project deadlines

  • Custom systems and solutions designed specifically for your project

  • Smart digital systems, real people, better outcomes

  • Fully compliant and correctly documented. Every time.

04

TAILORED SOLUTIONS

Custom systems and solutions designed specifically for your project

03

ON-TIME DELIVERY

Delivered on time, on budget, and aligned with critical project deadlines

06

COMPLIANT + COMMITTED

Fully compliant and correctly documented. Every time.

05

DIGITALLY ENABLED. PEOPLE DRIVEN

Smart digital systems, real people, better outcomes

01

CLEAR PRICING

Transparent quotes with no hidden fees

02

LICENSED. QUALIFIED. INSURED.

Qualified builders, waterproofers, carpenters, and construction managers

Simplicity.

Transparency.

Skill.

Our approach is simple—do it properly, strip out unnecessary distractions, and focus on the job.

 

We believe in clear communication, technical accuracy, and delivering quality work that performs.

Premium Waterproofing + Construction Solutions

25+

Years' Experience

#1

Multi Award-Winning

WATERPROOFING + CONSTRUCTION SOLUTIONS   ||   WATERPROOFING + CONSTRUCTION SOLUTIONS

INDUSTRY ALIGNED +

TRAINED.

We comply with/are trained and certified by the suppliers, manufacturers, industry bodies, and regulators that define the, licenses, requirements and standards.

Difference

Simplicity.

Transparency.

Skill.

Our approach is simple—do it properly, strip out unnecessary distractions, and focus on the job.

 

We believe in clear communication, technical accuracy, and delivering quality work that performs.

01

CLEAR PRICING

Transparent quotes with no hidden fees

02

LICENSED. QUALIFIED. INSURED

Qualified builders, waterproofers, carpenters, and construction managers

03

ON-TIME DELIVERY

Delivered on time, on budget, and aligned with critical project deadlines

04

TAILORED SOLUTIONS

Custom systems and solutions designed specifically for your project

05

DIGITALLY ENABLED. PEOPLE DRIVEN

Smart digital systems, real people, better outcomes

06

COMPLIANT + COMMITTED

Fully compliant and correctly documented. Every time.

Process

Structured +

Consistent.

Our clear, structured process let's you know what’s happening, what’s next, and what to expect at every stage.

 

No shortcuts. No surprises. Just a system that works.

  • We start by understanding your project in detail.

    ​

    We review plans, scope, site conditions, risks, constraints, substrates, environmental exposure, and performance requirements to determine the most suitable waterproofing approach for the project.

    ​

    This ensures the system is specifically designed, sequenced, and aligned to real-world building conditions — not applied as a generic solution.

  • We translate the design and scope into a clear, buildable system — developing technical waterproofing and building specifications, selecting compatible materials, membranes, and components, coordinating sequencing with other trades, and preparing detailed methodology, scope, and pricing documentation.

    ​

    We ensure all preparation requirements are defined upfront — because most failures start before waterproofing even begins.

  • Execution is controlled, methodical, and quality-driven across all areas, including substrate preparation and priming, membrane installation to the required thickness and standards, critical detailing at joints, penetrations, and terminations, and ongoing inspections and testing conducted during and after application.

    ​

    Every stage is monitored to ensure the system performs as designed — not just visually, but technically.

  • We close out the project with full confidence, accountability, and verification. This includes final inspections, quality assurance checks, compliance verification against NCC and relevant Australian Standards, technical documentation, certification, and detailed reporting.

    ​

    Your project is handover-ready, fully documented, traceable, and prepared for future reference, maintenance, and long-term peace of mind.

    ​

    You’re left with a waterproofing system that is fully compliant, verified, documented, and built to perform long after completion.

06

COMPLIANT + COMMITTED

Fully compliant and correctly documented. Every time.

05

DIGITALLY ENABLED. PEOPLE DRIVEN

Smart digital systems, real people, better outcomes

04

TAILORED SOLUTIONS

Custom systems and solutions designed specifically for your project

03

ON-TIME DELIVERY

Delivered on time, on budget, and aligned with critical project deadlines

02

LICENSED. QUALIFIED. INSURED

Qualified builders, waterproofers, carpenters, and construction managers

ETHOS

Simplicity.

Transparency.

Skill.

Our approach is simple—do it properly, strip out unnecessary distractions, and focus on the job.

 

We believe in clear communication, technical accuracy, and delivering quality work that performs.

01

CLEAR PRICING

Transparent quotes with no hidden fees

02

LICENSED. QUALIFIED. INSURED

Qualified builders, waterproofers, carpenters, and construction managers

03

ON-TIME DELIVERY

Delivered on time, on budget, and aligned with critical project deadlines

05

DIGITALLY ENABLED. PEOPLE DRIVEN

Smart digital systems, real people, better outcomes

04

TAILORED SOLUTIONS

Custom systems and solutions designed specifically for your project

06

COMPLIANT + COMMITTED

Fully compliant and correctly documented. Every time.

04

TAILORED SOLUTIONS

Custom systems and solutions designed specifically for your project

04

TAILORED SOLUTIONS

Custom systems and solutions designed specifically for your project

INDustry partners

INDUSTRY ALIGNED +

TRAINED.

We comply with/are trained and certified by the suppliers, manufacturers, industry bodies, and regulators that define the, licenses, requirements and standards.

Screenshot 2026-06-11 094310.png
Screenshot 2026-06-11 094359.png
official-member1.jpg
Screenshot 2026-06-11 094640.png
Screenshot 2026-06-11 094727.png
1df4ed_00b7e8e9f85744df8c05871ff4c10b4b~mv2.png
mapei-logo.png
ardex-logo-black.png
soprema-building-for-life-web-rgb-adapted-version-1_fbadfd639a91d7498b02c75cf7a0bf70.png
Close up of water drop texture on waterproof fabric material.jpg
    • Australian Standards
      The Australian Standards require mandatory inspection stages, membrane verification, compliant detailing, and overlay inspections before finishes are applied.

    • Mandatory Testing + Verification
      Membrane continuity, dry film thickness (DFT), curing, termination heights, penetrations, and waterstops must be visually inspected and verified prior to overlay and handover.

    • NCC Compliance
      Waterproofing systems must comply with National Construction Code performance requirements to prevent water ingress into concealed building cavities and structural elements.

    • Overlay Stage Inspections
      The Australian Standards require waterproofing systems to be inspected at overlay stage to identify pinholes, membrane defects, inadequate curing, and installation inconsistencies before concealment.

    • Flood Testing Requirements
      Where flood testing is undertaken, membranes must reach full cure prior to water exposure to ensure accurate performance verification.

    • Documentation + Certification
      Inspection records, testing outcomes, photographic evidence, waterproofing certificates, and compliance documentation are critical parts of waterproofing quality assurance and certification processes.

    • Correct Dry Film Thickness (DFT)
      Membranes must achieve manufacturer-specified dry film thickness to ensure durability, flexibility, and long-term waterproofing performance.

    • Moisture + Curing Control
      Substrate moisture levels, ambient conditions, and curing must be monitored to prevent membrane failure, delamination, and trapped moisture issues.

    • System Compatibility
      Primers, membranes, sealants, bond breakers, substrates, and finishes must be compatible and installed in accordance with technical data sheets and Australian Standards.

    • Critical Detailing Requirements
      Penetrations, junctions, movement joints, drainage connections, waterstops, and vertical terminations are among the highest-risk failure points and require precise compliant detailing.

    • Continuous Membrane Integrity
      Waterproofing systems must maintain full continuity without pinholes, splits, voids, shrinkage defects, or inadequate transitions before overlay and completion.

    • Falls, Drainage + Water Management
      Correct falls, drainage design, and surface preparation are critical to preventing ponding water, hydrostatic pressure, and premature system deterioration.

    • Environmental + Site Monitoring
      Weather exposure, temperature, humidity, and changing site conditions can significantly impact membrane performance and curing behaviour during installation.

    • Performance Verification
      Testing, inspections, thermal imaging, moisture assessment, and flood testing help verify that the installed system performs as intended before handover.

    • Verification at Every Stage
      Waterproofing systems should be inspected, assessed, and verified throughout preparation, installation, curing, and completion—not just at handover.

    • Testing Before Concealment
      Critical checks should occur before foot traffic is present and overlays, screeds, tiles, and finishes conceal the waterproofing system and limit defect visibility.

    • Moisture Verification
      Substrate moisture testing helps confirm surfaces are within acceptable tolerances prior to membrane application and overlay.

    • Flood Testing + System Integrity
      Flood testing helps verify membrane continuity, drainage performance, and overall system integrity under controlled conditions.

    • Thermal Imaging + Leak Detection
      Advanced diagnostic testing assists in identifying hidden moisture ingress, active leaks, and concealed waterproofing failures.

    • Photographic + Digital Records
      Structured photographic documentation and reporting provide transparency, traceability, and long-term project accountability.

    • Compliance Verification
      System installation, detailing, curing, and product application should be verified against NCC provisions, Australian Standards, and manufacturer specifications.

    • Certified Handover Documentation
      Testing outcomes, inspection records, warranties, certifications, and compliance documentation provide assurance at completion and into the future.

    • Full Cure Before Flood Testing
      Membranes must reach full cure before exposure to water or flood testing to ensure accurate performance verification.

    • Ambient Conditions Matter
      Temperature, humidity, ventilation, and weather conditions can significantly affect membrane curing times and overall system performance.

    • Premature Overlay Risks
      Applying screeds, adhesives, tiles, or finishes before proper curing can trap moisture and compromise membrane integrity and adhesion.

    • Manufacturer-Specified Cure Times
      Every waterproofing system has specific curing and recoat requirements that must be followed in accordance with technical data sheets.

    • Moisture Entrapment Prevention
      Incorrect curing conditions can lead to blistering, debonding, membrane shrinkage, and long-term waterproofing failure.

    • Critical Verification Stage
      Curing stages should be monitored and verified before overlay, flood testing, or handover to ensure the system performs as designed.

    • Environmental Monitoring
      Continuous assessment of site conditions helps ensure curing performance remains consistent throughout installation.

    • System Performance Depends on Cure Quality
      Correct curing is critical to achieving membrane flexibility, adhesion, continuity, and long-term durability.

    • Most Failures Remain Hidden
      Waterproofing defects often develop behind tiles, screeds, walls, and concealed building cavities long before visible signs appear.

    • Damage Starts Before Detection
      By the time leaks become visible, moisture intrusion has often already affected substrates, adhesives, framing, insulation, and structural elements.

    • Common Hidden Defects
      Insufficient membrane thickness, trapped moisture, failed detailing, membrane voids, poor curing, and non-compliant penetrations are among the most common concealed failures.

    • Concealed Water Ingress Risks
      Undetected moisture can lead to mould growth, material deterioration, corrosion, delamination, and long-term structural damage.

    • Overlay Concealment
      Once tiles, screeds, and finishes are installed, identifying the original source of failure becomes significantly more difficult and costly.

    • Testing Reduces Risk
      Moisture testing, thermal imaging, flood testing, and overlay inspections help identify hidden issues before systems are concealed or handed over.

    • Verification Prevents Rectification
      Early identification and correction of defects dramatically reduces the likelihood of costly future remediation works.

    • Invisible Doesn’t Mean Compliant
      A waterproofing system may appear visually complete while still containing critical defects that compromise long-term performance.

    • Mandatory Compliance Documentation
      Waterproofing works should be supported by compliant certification, inspection records, testing outcomes, and installation documentation.

    • Waterproofing Certificates
      Certificates should identify the installed system, application areas, products used, relevant standards, installation dates, and responsible licensed contractor.

    • Inspection + Testing Records
      Compliance documentation should include overlay inspections, flood testing outcomes, membrane verification, curing confirmation, and defect assessments where applicable.

    • Photographic Verification
      Photographic records provide evidence of substrate preparation, detailing, membrane application, penetrations, waterstops, terminations, and completed works before concealment.

    • Product + System Traceability
      Technical data sheets, batch information, product specifications, and compatible system details help verify correct material selection and installation compliance.

    • NCC + Australian Standards Alignment
      Reports and certification should demonstrate compliance with NCC provisions and relevant Australian Standards.

    • Handover + Warranty Records
      Completion documentation should include warranties, maintenance recommendations, certification, testing results, and digital records for future reference and asset protection.

    • Clear Accountability
      Proper reporting creates traceability across the project lifecycle—ensuring installation methods, inspections, testing, and compliance obligations are fully documented.

  • Waterproofing works in Australia must comply with the NCC and relevant Australian standards and can only be done by qualified and licensed contractors. In QLD, this is a QBCC license.

    ​

    Licensed professionals ensure all works meet these requirements—protecting the building, maintaining compliance, and reducing risk of defects and non-conforming work.

REVIEWS

What people say

  • 5 Stars

    “For over 5 years, I’ve collaborated with tekDB on projects, and their consistency of excellence is genuinely remarkable. Their meticulous attention to detail and commitment to industry-leading quality set them apart.

    ​

    Every project — across construction and waterproofing — reflects their dedication to craftsmanship, earning ongoing positive feedback from clients and industry peers.”

    ​

    — Commercial & Real Estate Client

  • 5 Stars

    “tekDB takes the time to understand your requirements, delivering innovative solutions and systems that exceed expectations.

    ​

    Their expertise is evident at every stage — from initial planning and site analysis through to the final touches. Communication is clear, and transparency is seamless.”

    ​

    — Brisbane Client

  • 5 Stars

    "We work with leading architects, trades and builders and can honestly say that tekDB's work is above the best. We have no hesitation in recommending them — they will remain our first choice moving forward."

     

    — Hawthorne Client

  • 5 Stars

    “Working with tekDB has been an absolute game-changer for our projects.

     

    From the very first consultation, it was clear we were in the hands of a team that understood our goals and was committed to delivering impeccable attention to detail and professionalism.”

    ​

    — New Farm Client

  • 5 Stars

    “What truly sets tekDB apart is their dedication to quality and excellence — from craftsmanship through to materials. The project was completed on time and within budget, reflecting efficient project management and an unwavering commitment to delivering exceptional client outcomes.

    ​

    We felt supported and valued every step of the way, and the final result is a testament to their skill and passion for what they do.”

    ​

    — Brisbane Client

  • 5 Stars

    “From a quality and technical standpoint, tekDB’s approach to waterproofing was exceptional. Every detail was carefully considered and executed in accordance with best practice, ensuring both performance and longevity.

    ​

    Their professionalism and structured delivery made the entire process seamless.”

    ​

    — Gold Coast Client

bottom of page